

The Project: This subframe was chemically stripped, our DSE Coilover Kit installed, and then the entire subframe was painted satin black. Final assembly included installation of our DSE
Tubular Upper Control Arms, Lower Control Arm Bushings, DSE Modified Steering Gear, Tubular Tie Rod Adjusters, and new steering components. A Baer track 13" brake system was also installed.
The Owner: We checked up on Jim recently on our way through Texas and his '69 Camaro is now complete!
![]()
Click on any image below to start the slideshow.